1

Road & Bridge Adopt a Roadway Program

#FFFFFF

Interested in Adopting a Roadway in Saguache County?  Please fill out the required application, as well as the policies and procedures page and return to the address or email listed at the bottom of the application.  Once your application is received....we will contact you prior to sign installation....

Application must be filled out and returned to the address or email at the bottom of the application.

Download Application  

Application must be filled out and returned to the address or email at the bottom of the application.

Download Policies and Procedures  

Once your application is received - the Road & Bridge department will complete and return a copy to you after the signs are installed.  Once your application is received, we will contact you prior to sign installation.

Form to use at your discretion - does not need to be returned.

Download Waiver and Release Agreement

Form to use at your discretion - this form must be sent to the Road Bridge if you decide to submit photos after a scheduled clean-up for each person that may be easily identified in the photos.  

Download Volunteer Photo Consent and Release Agreement

 Form to use at your discretion. 

Download Roadway Cleanup and Safety Procedures

After each scheduled clean-up is complete: this form must be filled out and returned to the fax number or email listed on the form.  If you plan to submit pictures - please make sure that the Volunteer Photo Consent and Release form is returned for each person that may be easily identified in the photos submitted.

Download Accomplishment Form

A high quality reflective sign will have the organization or individual listed at the bottom of the sign, along with the designated miles.  

View example of Adopt a Roadway sign 

#FFFFFF

Last Updated: 07/25/2024